Spanning Tree: Simulation
3550-1 is the root bridge. BID 4096
3550-2 is the secondary bridge which I want it to become root if 3550-2 is down. BID 8192.
I turned off 3550-1
Originally 3550-2
Interface Role Sts Cost Prio.Nbr Type
——————- —- — ——— ——– ——————————–
Fa0/1 Altn BLK 19 128.1 P2p
Fa0/2 Root FWD 19 128.2 P2p
Interface Role Sts Cost Prio.Nbr Type
——————- —- — ——— ——– ——————————–
Fa0/1 Desg LRN 19 128.1 P2p
Fa0/2 Desg FWD 19 128.2 P2p
Network down for 50s
VLAN0001
Spanning tree enabled protocol ieee
Root ID Priority 8193
Address 000c.85e5.5380
This bridge is the root
Hello Time 2 sec Max Age 20 sec Forward Delay 15 sec
Bridge ID Priority 8193 (priority 8192 sys-id-ext 1)
Address 000c.85e5.5380
Hello Time 2 sec Max Age 20 sec Forward Delay 15 sec
Aging Time 300
Interface Role Sts Cost Prio.Nbr Type
——————- —- — ——— ——– ——————————–
Fa0/1 Desg FWD 19 128.1 P2p
Fa0/2 Desg FWD 19 128.2 P2p