Hot standby router protocol (HSRP): Recovery / failover time test

Diagram for HSRP test plan Test objective and test procedures Both 1841 routers were configured HSRPv2 for redundancy. Vlan 10 is tested in this test plan to demonstrate the failover time when a link failed between router and switch. Catalyst 3750 switches were stacked together as a single entity, two links were connected to different … Continue reading Hot standby router protocol (HSRP): Recovery / failover time test